Culinary Arts Center

Client: Castro Valley USD

Cost: $3 million

Castro Valley, CA

Project Delivery: Lease-Leaseback

Size: 2,700 sq ft

Project Type: Modernization

The Culinary Arts Center at Castro Valley High School was developed from a former auto shop that was later used as a physics classroom. This new CTE facility features a flexible culinary classroom with a teaching station and a fully equipped, future-proofed all-electric commercial kitchen. Designed to support a dynamic program, the space can also be configured to simulate a real restaurant setting.

Kitchen

05
Project Role & Contribution: Design Team + Job Captain + Project Manager
Developed construction drawings and documentation across all phases of modernization, from Schematic Design (SD) through Construction Administration (CA). Served as the primary client liaison for project delivery and communication.

Before; Physics Classroom

After; Culinary Classroom

Exterior

Campus